Non-Compliance detail


  
Summary
 
Licence number: 832
Annual Return Start: 01 Jul 2016
Annual Return End: 30 Jun 2017
Date Received: 07 Sep 2017
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L4 Volume and mass l Infiltration and inflows into sewage treatment system due to heavy rainfall. The volume limit of 4300kL per day exceeded on 14 occasions. PRP to address non-compliance(s) issued 14
L3 Concentration Lim Total phosphorus 100%ile limit (5mg/L) exceeded twice and 90%ile limit (2mg/L) exceeded seven times. Sludge over-loading in detention ponds carrying through treatment system. PRP to address non-compliance(s) issued 7
L3 Concentration lim Total suspended solids 100%ile limit of 30mg/L exceeded twice 21/09/16 (34mg/L) and 18/01/17 (32mg/L). Entrainment of solids throughout the detention pond system being flushed through the treatment train. PRP to address non-compliance(s) issued 2