Non-Compliance detail


  
Summary
 
Licence number: 805
Annual Return Start: 01 Feb 2011
Annual Return End: 31 Jan 2012
Date Received: 30 Mar 2012
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L3.3 Exceeded limits for BOD and Total Suspended Solids on various occasions. The plant upgrade required by Pollution Reduction Program, being a new membrane bioreactor, was commissioned in July 2011. Since then, all effluent results have complied. Appropriate Action taken by licensee 4
L4.1 On 2 occasions, the volume taken into the plant exceeded the limit of 9,900kL/day. There is an ongoing rehabilitation capital works program to reduce the inflow/infiltration into the sewerage system. Appropriate Action taken by licensee 2