Licence number: 779
Annual Return Start: 01 Feb 2015
Annual Return End: 31 Jan 2016
Date Received: 31 Mar 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1 Following rainfall events stormwater detention basins over-boarded at Antiene Rail Unloader Facility, resulting in release of water to Maidswater Ck - Lake Liddell. Temporary measures and sediment control installed. Review of site water management. EPA to monitor future compliance with this condition 6
L3.6 Limits for Oil and Grease and pH not complied with on various occasions due to equipment malfunctions and high volume rainfall. Repairs/investigation undertaken. Clean-up carried out. Water testing carried out. EPA advised. EPA to monitor future compliance with this condition 9
L1.1 Overboarding of seepage pond due to pump failure, leak from flyash transfer line due to erosion, return water pipeline failure resulting in release of return water to seepage ponds, discharge of water due to failure of pipe. Repairs completed. PRP to address non-compliance(s) issued 4