Non-Compliance detail


  
Summary
 
Licence number: 765
Annual Return Start: 01 Jan 2006
Annual Return End: 31 Dec 2006
Date Received: 22 Feb 2007
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Monitoring Point 2 - Lab analysis of the concentration of nitrogen, phosphorus and oil and grease were not undertaken during reporting period. Appropriate Action taken by licensee 3
M2.1 Monitoring Point 7 - the dust collection device was out of service for a period owing to physical damage. This resulted in 9 out of the required 12 samples being collected for that gauge during the reporting period. Appropriate Action taken by licensee 3
L3.3 Monitoring Point 11 - A single exceedance for total iron (1.1 mg/L vs licence limit of 1.0 mg/L) for a water sample taken on 22 February 2006. Appropriate Action taken by licensee 1
M6.1 Monitoring Point 6 - discharge volume data from the north mine dewatering bore was not obtained for reporting period by continous data logger Appropriate Action taken by licensee 1