Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
761
Annual Return Start:
01 Jul 2024
Annual Return End:
30 Jun 2025
Date Received:
06 Aug 2025
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
L3.8
The concentration limit for TSS (50mg/L) was exceeded twice (91mg/L and 60mg/l) in water discharged at EPA 25 during the ash dam overboard event that resulted from severe weather in April and May.
EPA action determined as part of scheduled inspection program
2
L3.8
The upper limit for pH (9.0) was exceeded on nine occasions in water discharged at EPA 25 during the ash dam overboard event that resulted from severe weather in April and May. Minimum, average, and maximum of 9.02, 9.19 and 9.41 respectively.
EPA action determined as part of scheduled inspection program
9
L3.5
The 99th percentile concentration limit for sulfur dioxide at EPA 3 (Unit 6) was exceeded at 10pm on 12 May 2025 (88th hour >1400 mg/m3 recorded within the 2024/25 reporting period).
EPA action determined as part of scheduled inspection program
1
L7.1
The Ash Dam began discharging at EPA25 without receiving >400mm of rain within the 31-days immediately prior to discharge as required by condition L7.1.
EPA action determined as part of scheduled inspection program
1