Licence conditions for pollution studies and reduction program


  

Licence conditions for pollution studies and reduction programs

Summary
 
Licence number: 573
Title: PRP 2 - Integrated Maintenance Management System
Start date: 16 Jul 2015
 
Licence Condition
The licensee must implement all works identified in its letter of 18 June 2015 (DOC15/226588). This work includes: a) Replacing the existing inlet flow meter at the Moonee WRP with a new instrument capable of generating an empty tube alarm and a reverse flow alarm by 11 September 2015. b) Validating the reverse flow alarms for the flow meters at Coffs Harbour, Moonee and Woolgoolga WRPs and incorporating this validation process into the integrated maintenance management system. c) Writing a new code to enable viewing of daily totalised flows and flow trend data from both the pumping station and WRP SCADA databases on a single screen by 31 December 2015. d) Updating Compilation Plans to ensure all Works as Executed drawings are referenced and all scour valves, stop valves and air valves are included on the Compilation Plans by 31 December 2015. e) Implementing wet weather high flow alarms on all Variable Speed Drive pumping stations by 30 June 2016. f) Implementing an integrated maintenance management system by 31 December 2016. g) Implementing wet weather high flow alarms on all Direct On Line pumping stations by 30 June 2017. The licensee must provide written notification to the EPA of completion of each of the listed works at the time of their completion.  Note: Written notification can be provided by email to north.coast@epa.nsw.gov.au.