Non-Compliance detail


  
Summary
 
Licence number: 563
Annual Return Start: 20 Jul 2000
Annual Return End: 19 Jul 2001
Date Received: 13 Sep 2001
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L6.2 Three blasts on 22/5/01 were not captured by the Datamaster blast monitoring due to site wide power failure. Several other blasts were not capturedbecasue threshold levels (0.25mm/sec) were not triggered N/A N/A