Non-Compliance detail


  
Summary
 
Licence number: 563
Annual Return Start: 20 Jul 2011
Annual Return End: 19 Jul 2012
Date Received: 17 Sep 2012
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Depositional dust gauge's E2 and E3 were not sampled on 1 occasion due to points being inaccessible; TSP high volume air sampler was not sampled on 7 occasions due to failure of sampler motor and delay in getting replacement unit. Appropriate Action taken by licensee 7
R3 Tailings were observed flowing from a containment dam into Nine Mile Creek due to the failure of a steel T piece in tailings pipeline. PRP to address non-compliance(s) issued 1