Non-Compliance detail


  
Summary
 
Licence number: 4911
Annual Return Start: 24 Nov 2023
Annual Return End: 23 Nov 2024
Date Received: 23 Dec 2024
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.2 Twelve depositional dust samples are required to be collected and analysed from licenced monitoring point 11 (DDG5) during the reporting period. Twelve samples were collected from the monitoring point, however, only eleven samples were analysed. EPA action determined as part of scheduled inspection program 1
M2.2 Exposure period of EPL monitoring points 6, 8, 10, 11 and 12 exceeded recommended maximum of 32 days. EPA action determined as part of scheduled inspection program 1