Non-Compliance detail


  
Summary
 
Licence number: 467
Annual Return Start: 01 Jan 2023
Annual Return End: 31 Dec 2023
Date Received: 29 Feb 2024
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 3 (LDP003) EPA action determined as part of scheduled inspection program 1
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 16 (Wolgan River upstream) EPA action determined as part of scheduled inspection program 1
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 17 (Wolgan River Downstream) EPA action determined as part of scheduled inspection program 4
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 18 (Bore AP1801DP) EPA action determined as part of scheduled inspection program 3
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 2 (LDP002) EPA action determined as part of scheduled inspection program 1
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 (Oil and Grease) at EPL Point 16 (Wolgan River upstream) EPA action determined as part of scheduled inspection program 1
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 18 (Bore AP1801DP) EPA action determined as part of scheduled inspection program 4
M2.3 - Water and/ or Failure to monitor in accordance with M2.3 at EPL Point 18 (Bore AP1801DP) EPA action determined as part of scheduled inspection program 2