Summary
 
Licence number: 430
Title: Water Treatment Plant Upgrade
Start date: 07 Dec 2018
 
Licence Condition
The licensee must complete a water treatment plant scoping study (scoping study) for the upgrade of the Condobolin water treatment plant (WTP) to investigate options to manage from the water treatment process to prevent discharges to the environment. The scoping Study must be submitted to the Bathurst office of the EPA by 5pm 30 June 2019.
The licensee must complete a water treatment plant concept design (WTCD) which utilises the preferred option/s from the scoping study required by condition U1.1 above to manage wastewater from the water treatment process to prevent discharges to the environment. The WTCD must be submitted to the Bathurst Office of the EPA by 5pm 31 October 2019.
The licensee must complete a water treatment plant upgrade detailed design that is suitable for the construction of the proposed structures to manage wastewater from the water treatment process to prevent discharges to the environment. The water treatment plant option detailed design must be provided to the Bathurst of the EPA by  5pm 28 February 2020.
By 28 February 2020 the licensee must complete the works identified in the detailed design required by condition U1.3 above to manage wastewater from the water treatment process to prevent discharges to the environment.