Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
3390
Annual Return Start:
31 Aug 2012
Annual Return End:
30 Aug 2013
Date Received:
31 Aug 2013
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
M2.2
Not all monitoring samples collected due to disconnection of power and equipment failure. Power reconnected, equipment serviced and repaired.
Appropriate Action taken by licensee
13
L3.5
Vibration limit exceeded due to low frequency waves. Internal and external technical investigation. Blast frequency study undertaken.
EPA to monitor future compliance with this condition
1
L3.3
Blast overpressure limit exceeded on two occasions due to previous drilling and blasting, & single unconfined blast hole. Internal investigations undertaken. Review of blast pattern. Changed overloaded blast hole definition.
EPA to monitor future compliance with this condition
2
L3.2
Exceedance of blast overpressure for more than 5% of total blasts over each reporting period. Investigations undertaken into all exceedances. Review of design/implementation of blast pattern. Change overloaded blast hole definition.
EPA to monitor future compliance with this condition
4