Non-Compliance detail


  
Summary
 
Licence number: 2863
Annual Return Start: 30 Mar 2015
Annual Return End: 29 Mar 2016
Date Received: 01 Jun 2016
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.1 100% concentration limit exceeded for TSS at licence discharge point 1. The cause was identified as short circuiting of sludge lagoon 2 inlet flow to the outlet, due to damage to the pipe underdrains when the lagoons were cleaned. EPA to monitor future compliance with this condition 2
L3.1 Approx. 12 ML water passed through EPL discharge point 1 exceeding EPL volume limit 2 ML/day. Programmable Logic Controller failed and raw water inlet valve defaulted to an open position, causing overflow until the valve was manually closed. EPA to monitor future compliance with this condition 1