Licence number: 2652
Annual Return Start: 12 Jan 2002
Annual Return End: 11 Jan 2003
Date Received: 10 Mar 2003
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
O1.1 Spraying of weeds undertaken by licenced contractors resulted in damage (browning and scorching) to riparian trees along a 600m stretch of the Hunter River. N/A N/A
L7.2 Blasting limits exceeded 120dB in blast monitor OV7 on April 8, 2002. N/A N/A
O1.1 The automated water management system failed, resulting in excessive pit water entering the 3rd Ramp Dam, causing an overflow Bayswater Creek on 27 May 2002. N/A N/A
L7.2 A blast exceeded 120dB at OV2 on 10 December, 2002. N/A N/A