Non-Compliance detail


  
Summary
 
Licence number: 2652
Annual Return Start: 12 Jan 2022
Annual Return End: 11 Jan 2023
Date Received: 09 Mar 2023
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
E1.3 Hourly discharge rate was exceeded on 40 x one hour occasions spread across 22 days where HRSTS discharge block had been published. EPA action determined as part of scheduled inspection program 40
M5.1 Failed to obtain continuous weather station monitoring from point 13 EPA action determined as part of scheduled inspection program 2
M2.2 SX45-G1 and SX45-G2 sustained power outages as a result of both planned and unplanned maintenance services. Data Capture SX45-G1 = 98%, Data Capture SX45-G2 = 93% EPA action determined as part of scheduled inspection program 33
M2.3 Failed to collect grab samples from EPL3 and EPL4 EPA action determined as part of scheduled inspection program 13