Licence number: 2652
Annual Return Start: 12 Jan 2008
Annual Return End: 11 Jan 2009
Date Received: 11 Mar 2009
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L7.2 The airblast overpressure level from blasting operations on the premises exceeded 120 dB(A) Penalty Notice issued 1
R4.1 An administrative lapse resulted in the annual report for the 2007 - 2008 Hunter River Salinity Trading Scheme (HRSTS) being received by DECC 6 days after the reporting period. EPA has written to licensee regarding non-compliance and relevant action 1
M2.1 At HV5 (Cheshunt property) a result was not recorded due to a malfunction of the high volume air sampler caused by a power surge. Appropriate Action taken by licensee 1