Non-Compliance detail


  
Summary
 
Licence number: 2509
Annual Return Start: 06 Aug 2008
Annual Return End: 05 Aug 2009
Date Received: 07 Oct 2009
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Monitoring Point 1 was not sampled during April 2009 because the sample bottle overflowed. Appropriate Action taken by licensee 1
M2.1 Monitoring Point 18 was not sampled during November 2008 as the sample bottle was vandalised and in April 2009 the sample bottle overflowed. Appropriate Action taken by licensee 2