Licence conditions for pollution studies and reduction program


  

Licence conditions for pollution studies and reduction programs

Summary
 
Licence number: 21229
Title: Staged implementation of Noise Mitigation Controls
Start date: 17 May 2019
 
Licence Condition
By 30 June 2019, install noise barriers around the OL2/OL3 overland conveyor transfer point drives between Lidsdale Siding and Mount Piper Power Station.
By 30 June 2019, the licensee must clad the existing coal preparation plant (CPP) with noise attenuating panels to achieve compliance with the licence noise limits.
By 30 December 2019, upgrade mobile plant used on premises to meet as a minimum, the sound power level of 109 dB (A-weighted)/ 113 dB (linear) for Loaders, and the sound power level of 108 dB (A-weighted)/ 117 dB (linear) for Dozers.