Non-Compliance detail


  
Summary
 
Licence number: 2122
Annual Return Start: 02 Sep 2014
Annual Return End: 30 Jun 2015
Date Received: 25 Aug 2015
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L1.1 Ash laden water overboarded into creek after pump failed; water leaked from pipeline into stormwater; oil escaped from Turbine cooler; pipeline failed. Auxiliary pump used, repair & upgrade works carried out. Inspections & maintenance formalised. PRP to address non-compliance(s) issued 3
O2.1 Ash laden water overboarded into creek after pump failed; water leaked from pipeline into stormwater. Upgrade works carried out; bunding placed at stormwater entrance, failed pipe replaced. Inspections & maintenance formalised. EPA has written to licensee regarding non-compliance and relevant action 1