Non-Compliance detail


  
Summary
 
Licence number: 2094
Annual Return Start: 30 Jun 2018
Annual Return End: 29 Jun 2019
Date Received: 26 Aug 2019
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.2 Monitoring Point 12 failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction. N/A 9
M2.2 Monitoring Point 10 failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction or planned maintenance activities. N/A 11
M2.2 Monitoring Point 11 failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction. N/A 11
M2.2 Monitoring Point 9 failed to monitor PM10 continuously in accordance with Condition M2.2 during the reporting period due to equipment malfunction or planned maintenance activities. N/A 2
L1 Uncontained sediment laden surface runoff breached a containment drain and flowing to an isolated pool within Bowman’s Creek. N/A 1