Non-Compliance detail


  
Summary
 
Licence number: 20794
Annual Return Start: 29 Sep 2019
Annual Return End: 28 Sep 2020
Date Received: 25 Nov 2020
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
A3.1 On the inspection of 7 August 2020 the EPA observed that the sediment basin was over-flowing. Ballina Weather Observations advised that 33.6 mm of rain had fallen to 5.30 pm on 7 August 2020 PRP to address non-compliance(s) issued 1