Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
L2.2 Total nitrogen and BOD load discharged from STP exceeded annual limit. Hydraulic load, growth of catchment. Plant commissioned during reporting year. New plant to be fully implemented. Appropriate Action taken by licensee 1
L3.3 BOD from plant exceeded limit on 2 from 13 sampling periods. Process of commissioning new plant. Appropriate Action taken by licensee 2
O3.1 Significant rainfall over 3 days produced a large increase to system flows resulting to bypass into storm detention pond. 3.5ML spilt from pond into ocean outfall system. Inspections of infiltration sources and repairs. Appropriate Action taken by licensee 1