Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
12894
Annual Return Start:
07 Jul 2022
Annual Return End:
06 Jul 2023
Date Received:
31 Aug 2023
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
M2.3 – Point 12
During a HRSTS discharge event, the daily salt load limit was exceeded. The daily salt load limit was 36.7t which Mangoola discharged 40.6t. During the same event, the EC was recorded as an average of 4777 µS/cm exceeding 4750 µS/cm requirement for d
EPA action determined as part of scheduled inspection program
1
M2.3 – Point 12
During a HRSTS discharge event, the daily volume discharge limit was exceeded. The daily volume discharge limit was 0.0ML which Mangoola discharged 0.3 ML of water. The daily salt load limit was 0.0t which Mangoola discharged 0.7t.
EPA action determined as part of scheduled inspection program
1
M2.3 – Point 12
During a HRSTS discharge event, the daily volume discharge limit was exceeded. The daily volume discharge limit was 0.0ML which Mangoola discharged 0.04 ML of water. The daily salt load limit was 0.0t which Mangoola discharged 0.1t.
EPA action determined as part of scheduled inspection program
1
M2.3 – Point 12
During a HRSTS discharge event, the daily salt load limit was exceeded. The daily salt load limit was 4.4t which Mangoola discharged 4.7t.
EPA action determined as part of scheduled inspection program
1
M2.3 – Point 12
During a HRSTS discharge event, the daily salt load limit was exceeded. The daily salt load limit was 139.7t which Mangoola discharged 150.1t.
EPA action determined as part of scheduled inspection program
1
M2.2 – Monitoring Po
Failure to continuously monitor PM10 concentration at Monitoring Point 20 due to breakdowns and maintenance.
EPA action determined as part of scheduled inspection program
3
M4.1 – Monitoring Po
Failure to continuously monitor meterological parameters at Monitoring Point 5 due to technical faults, routine maintenance and reasons outside foreseeable control of Mangoola Coal Operations.
EPA action determined as part of scheduled inspection program
10
M4.1 – Monitoring Po
Failure to continuously monitor meteorological parameters at Monitoring Point 18 due to technical faults, routine maintenance and reasons outside foreseeable control of Mangoola Coal Operations.
EPA action determined as part of scheduled inspection program
25