Environmental Issues
Public registers
POEO Public Register
Licences, applications and notices search
Penalty notices search
Enforceable undertakings search
Enforceable undertakings media releases
Exemptions and approvals search
Prosecutions or civil proceedings search
Terms of use: POEO public register
Licensing FAQs
List of licences
Unlicensed premises regulated by the EPA
Contaminated land record of notices
About the record of notices
List of notified sites
Tips for searching
Disclaimer
Dangerous goods licences
Pesticide licences
Radiation licences
Home
Public registers
POEO Public Register
Licences, applications and notices search
Non-Compliance detail
Summary
Licence number:
12894
Annual Return Start:
07 Jul 2021
Annual Return End:
06 Jul 2022
Date Received:
07 Sep 2022
Licence Condition number
Type of non-compliance
EPA actions
No. of times occurred
M4.1 – Point 18
The replacement of a data logger, completed by the monitor service provider, caused a failure in data capture of meteorological data..
EPA action determined as part of scheduled inspection program
1
M7.1 – Point 21
During a routine blast event no overpressure or vibration data was captured at Monitoring Point 21.
EPA action determined as part of scheduled inspection program
1
R3
The Mangoola Pollution Incident Response Plan (PIRMP) was triggered following water discharge event from Sandy Creek Farm Dam 2 to Tributary of Sandy Creek.
EPA action determined as part of scheduled inspection program
1
R3
The Mangoola Pollution Incident Response Plan (PIRMP) was triggered following water discharge event from Sandy Creek Farm Dam 2 to Tributary of Sandy Creek.
EPA action determined as part of scheduled inspection program
1
R3
The Mangoola Pollution Incident Response Plan (PIRMP) was triggered following water discharge event from Mangoola Continued Operations project area to Tributary of Big Flat Creek.
EPA action determined as part of scheduled inspection program
1
M2.1 – Point 19
Monitoring Point 19 – 24 hour average PM10 results not captured by the continuous air quality monitoring unit due to relocation of the monitor.
EPA action determined as part of scheduled inspection program
1
M2.3 – Point 12
During a HRSTS discharge event, the daily volume discharge limit was exceeded. The daily volume discharge limit was 10.1ML which Mangoola discharged 10.9 ML of water.
EPA action determined as part of scheduled inspection program
1
M9.1 – Point 34
During monthly attended noise monitoring, an attended noise monitoring site was not monitored due to restricted access.
EPA action determined as part of scheduled inspection program
1
M4.1 – Point 18
Following a data review, it was identified that there was missed meterological data for the period. The weather station failed to record temperature @ 10 metres.
EPA action determined as part of scheduled inspection program
1
R3
The Mangoola Pollution Incident Response Plan (PIRMP) was triggered following water discharge event from Mangoola Continued Operations project area to the tributary of Big Flat Creek
EPA action determined as part of scheduled inspection program
1