Non-Compliance detail


  
Summary
 
Licence number: 12894
Annual Return Start: 07 Jul 2011
Annual Return End: 06 Jul 2012
Date Received: 10 Sep 2012
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Not all monitoring requirments met during reporting period for various reasons including system malfunctions, power surges and no safe access to point. Appropriate Action taken by licensee 1
U2 Groundwater seepage identified to be flowing offsite, due to shallow groundwater being flushed from the sandstone formations. EPA has written to licensee regarding non-compliance and relevant action 1
R4.3 Failure to monitor noise at every receiver location specified in the licence EPA has written to licensee regarding non-compliance and relevant action 1